NVIDIA is trading at $191.99 (-4.07%) as investors weigh whether election outcomes and local opposition could slow or raise the cost of AI data-center construction.

  • Reuters reported semiconductor stocks remained under pressure amid those concerns; sector coverage described a rotation away from AI-linked chips.
  • Semiconductors were down 3.35%; the broader market was also lower, though the clearest reported pressure was sector-wide rather than company-specific.