Antimony Resources Corp. released assay results from its Bald Hill project confirming significant gold mineralization. The company reported drill intersections yielding up to 1.88 grams per tonne (g/t) of gold over 4.85 meters. These findings result from an evaluation of samples from more than 45 drill holes within the project's Main Zone.
Gold mineralization occurs within and adjacent to existing high-concentration antimony zones. This dual-mineralization potentially increases the overall economic value of the deposit.
The company will continue its exploration program through the end of 2026. Future efforts will focus on areas outside the Main Zone to determine the full extent of the mineralization.