TSMC has completed the main structure of its first European factory, located in Dresden, Germany.
The facility is being built by European Semiconductor Manufacturing Company (ESMC), a joint venture between TSMC, Bosch, Infineon and NXP. Mass production remains on schedule to begin by the end of 2027.
The total investment is expected to exceed €10 billion. TSMC holds a 70% stake in ESMC.
The fab will produce automotive and industrial chips using 28/22nm and 16/12nm process technologies. It is designed for a monthly capacity of 40,000 12-inch wafers and is expected to create approximately 2,000 direct high-tech jobs.